« 2010 Families Guide | Main | Walkthrough Frame Count in Revit 2010 »

June 26, 2009

TrackBack

TrackBack URL for this entry:
http://www.typepad.com/services/trackback/6a00e5540194f088340115706cc80d970c

Listed below are links to weblogs that reference Rolling Out Revit:

Comments

Rebecca

This tutorial was very helpful in setting up our Revit 2010 transition plan. However, as an A/E firm we disagree with your process of removing linked models and individually upgrading each model when upgrading a project. We typically have extensive graphic overrides set up for linked models and when the link is completely removed, those graphic overrides need to be created again from scratch. This is a time-intensive process and we don't want to lose the work that has already been done. So we would upgrade each model and keep the links unloaded but not removed - which shows the "one time upgrade" warning but allows us to keep our VG overrides.

The comments to this entry are closed.

RSS Feed

  •  Subscribe

Twitter Updates

    follow me on Twitter